Jump to content

Tiruvottriyur Theradi metro station

Coordinates: 13°09′36″N 80°17′59″E / 13.1598732°N 80.2998271°E / 13.1598732; 80.2998271
From Wikipedia, the free encyclopedia
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.


Thiruvottriyur Theradi
Logo of Chennai Metro Chennai Metro station
General information
LocationThiruvottriyur, Chennai, Tamil Nadu
Coordinates13°09′36″N 80°17′59″E / 13.1598732°N 80.2998271°E / 13.1598732; 80.2998271
Owned byChennai Metro
Operated byChennai Metro Rail Limited (CMRL)
Line(s)Blue Line
PlatformsSide platform
Platform-1 → Chennai International Airport (to be extended to Kilambakkam in the future)
Platform-2 → Wimco Nagar Depot
Tracks2
Construction
Structure typeElevated, Double track
AccessibleYes Disabled access[citation needed]
Other information
StatusOperational
Station codeSTT
History
Opened14 March 2022; 2 years ago (2022-03-14)
ElectrifiedSingle-phase 25 kV, 50 Hz AC through overhead catenary
Services
Preceding station Logo of Chennai Metro Chennai Metro Following station
Tiruvottriyur Blue Line Kaladipet
Blue Line
(Future Service)
Kaladipet
towards Kilambakkam
Location
Map

Thiruvottriyur Theradi (formerly known as Gowri Ashram Metro Station)[1] is an elevated metro station on the North-South Corridor of the Line 1 Extension of the Blue Line of Chennai Metro in Chennai, India. This station will serve the neighbourhoods of Thiruvottriyur and other northern suburbs of Chennai. This station was inaugurated along with Wimco Nagar Depot Metro Station on March 14, 2022.[2]

History

The station was still under construction during the inaugurated of the northern extension of Blue line of Phase I on 14 February 2021, so the stretch opened with other stations.[3][4] The station is expected to be completed by January 2022.[5] During the Construction of this station metro trains skips this station. This station was inaugurated along with wimco nagar depot metro station on March 14, 2022[2]

Station layout

Thiruvottriyur Theradi track layout
P2
P1
Station with two tracks and two side platforms
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 1
Southbound
Towards → Chennai International Airport
Next Station: Kaladipet
(to be further extended to Kilambakkam in the future)
Platform 2
Northbound
Towards ← Wimco Nagar Depot
Next Station: Tiruvottriyur
Side platform | Doors will open on the left Disabled access
L2

See also

References

  1. ^ C, Shivakumar (24 October 2020). "Phase-1 Metro extension trial next month". Express News Service. Retrieved 24 October 2020.
  2. ^ a b "Chennai metro rail opens two stations in phase-1 extension". The Indian Express. 14 March 2022. Retrieved 25 February 2023.
  3. ^ Cuenca, Oliver (16 February 2021). "Chennai Metro inaugurates Blue Line extension". International Railway Journal. IRJ. Retrieved 18 February 2021.
  4. ^ "CMRL likely to handle up to 3.5L daily commuters soon". The Times of India. Chennai: The Times Group. 14 February 2021. Retrieved 18 February 2021.
  5. ^ "Theradi Metro station may be opened in January". The Hindu. Chennai: Kasturi & Sons. 25 December 2021. Retrieved 30 December 2021.
  • UrbanRail.Net – descriptions of all metro systems in the world, each with a schematic map showing all stations.