This article needs additional citations for verification. (December 2019) |
In rail transport, track gauge is the distance between the two rails of a railway track. All vehicles on a rail network must have wheelsets that are compatible with the track gauge. Since many different track gauges exist worldwide, gauge differences often present a barrier to wider operation on railway networks.
The term derives from the metal bar, or gauge, that is used to ensure the distance between the rails is correct.
Railways also deploy two other gauges to ensure compliance with a required standard. A loading gauge is a two-dimensional profile that encompasses a cross-section of the track, a rail vehicle and a maximum-sized load: all rail vehicles and their loads must be contained in the corresponding envelope. A structure gauge specifies the outline into which structures (bridges, platforms, lineside equipment etc.) must not encroach.
Uses of the term
editThe most common use of the term "track gauge" refers to the transverse distance between the inside surfaces of the two load-bearing rails of a railway track, usually measured at 12.7 millimetres (0.50 inches) to 15.9 millimetres (0.63 inches) below the top of the rail head in order to clear worn corners and allow for rail heads having sloping sides.[1] The term derives from the "gauge", a metal bar with a precisely positioned lug at each end that track crews use to ensure the actual distance between the rails lies within tolerances of a prescribed standard: on curves, for example, the spacing is wider than normal.[2] Deriving from the name of the bar, the distance between these rails is also referred to as the track gauge.[3]
Choice of gauge
editEarly track gauges
editThe earliest form of railway was a wooden wagonway, along which single wagons were manhandled, almost always in or from a mine or quarry. Initially the wagons were guided by human muscle power; subsequently by various mechanical methods. Timber rails wore rapidly: later, flat cast-iron plates were provided to limit the wear. In some localities, the plates were made L-shaped, with the vertical part of the L guiding the wheels; this is generally referred to as a "plateway". Flanged wheels eventually became universal, and the spacing between the rails had to be compatible with that of the wagon wheels.[4]
As the guidance of the wagons was improved, short strings of wagons could be connected and pulled by teams of horses, and the track could be extended from the immediate vicinity of the mine or quarry, typically to a navigable waterway. The wagons were built to a consistent pattern and the track would be made to suit the needs of the horses and wagons: the gauge was more critical. The Penydarren Tramroad of 1802 in South Wales, a plateway, spaced these at 4 ft 4 in (1,321 mm) over the outside of the upstands.[5]
The Penydarren Tramroad probably carried the first journey by a locomotive, in 1804, and it was successful for the locomotive, but unsuccessful for the track: the plates were not strong enough to carry its weight. A considerable progressive step was made when cast iron edge rails were first employed; these had the major axis of the rail section configured vertically, giving a much stronger section to resist bending forces, and this was further improved when fish-belly rails were introduced.[6]
Edge rails required a close match between rail spacing and the configuration of the wheelsets, and the importance of the gauge was reinforced. Railways were still seen as local concerns: there was no appreciation of a future connection to other lines, and the choice of track gauge was still a pragmatic decision based on local requirements and prejudices, and probably determined by existing local designs of (road) vehicles.
Thus, the Monkland and Kirkintilloch Railway (1826) in the West of Scotland used 4 ft 6 in (1,372 mm);[7] the Dundee and Newtyle Railway (1831) in the north-east of Scotland adopted 4 ft 6+1⁄2 in (1,384 mm);[8] the Redruth and Chasewater Railway (1825) in Cornwall chose 4 ft (1,219 mm).[9]
The Arbroath and Forfar Railway opened in 1838 with a gauge of 5 ft 6 in (1,676 mm),[10] and the Ulster Railway of 1839 used 6 ft 2 in (1,880 mm).[10]
"Standard" gauge appears
editLocomotives were being developed in the first decades of the 19th century; they took various forms, but George Stephenson developed a successful locomotive on the Killingworth Wagonway, where he worked. His designs were successful, and when the Stockton and Darlington Railway was opened in 1825, it used his locomotives, with the same gauge as the Killingworth line, 4 ft 8 in (1,422 mm).[11][12]
The Stockton and Darlington line was very successful, and when the Liverpool and Manchester Railway, the first intercity line, was opened in 1830, it used the same gauge. It too was very successful, and the gauge, widened to 4 ft 8+1⁄2 in or 1,435 mm[11] and named "standard gauge", was well on its way to becoming the established norm.
Gauge differences
editThe Liverpool and Manchester was quickly followed by other trunk railways, with the Grand Junction Railway and the London and Birmingham Railway forming a huge preponderance of standard gauge. When Bristol promoters planned a line from London, they employed the innovative engineer Isambard Kingdom Brunel. He decided on a wider gauge, to give greater stability, and the Great Western Railway adopted a gauge of 7 ft (2,134 mm), later eased to 7 ft 1⁄4 in (2,140 mm). This became known as broad gauge. The Great Western Railway (GWR) was successful and was greatly expanded, directly and through friendly associated companies, widening the scope of broad gauge.
At the same time, other parts of Britain built railways to standard gauge, and British technology was exported to European countries and parts of North America, also using standard gauge. Britain polarised into two areas: those that used broad gauge and those that used standard gauge. In this context, standard gauge was referred to as "narrow gauge" to indicate the contrast. Some smaller concerns selected other non-standard gauges: the Eastern Counties Railway adopted 5 ft (1,524 mm). Most of them converted to standard gauge at an early date, but the GWR's broad gauge continued to grow.
The larger railway companies wished to expand geographically, and large areas were considered to be under their control. When a new independent line was proposed to open up an unconnected area, the gauge was crucial in determining the allegiance that the line would adopt: if it was broad gauge, it must be friendly to the Great Western railway; if narrow (standard) gauge, it must favour the other companies. The battle to persuade or coerce that choice became very intense, and became referred to as "the gauge wars".
As passenger and freight transport between the two areas became increasingly important, the difficulty of moving from one gauge to the other—the break of gauge—became more prominent and more objectionable. In 1845 a Royal Commission on Railway Gauges was created to look into the growing problem, and this led to the Regulating the Gauge of Railways Act 1846,[13] which forbade the construction of broad gauge lines unconnected with the broad gauge network. The broad gauge network was eventually converted—a progressive process completed in 1892, called gauge conversion. The same Act mandated the gauge of 5 ft 3 in (1,600 mm) for use in Ireland.
Gauge selection in other countries
editAs railways were built in other countries, the gauge selection was pragmatic: the track would have to fit the rolling stock. If locomotives were imported from elsewhere, especially in the early days, the track would be built to fit them. In some cases standard gauge was adopted, but many countries or companies chose a different gauge as their national gauge, either by governmental policy, or as a matter of individual choice.[14]
Terminology
editStandard gauge is generally known world-wide as being 1,435 mm (4 ft 8+1⁄2 in). Terms such as broad gauge and narrow gauge do not have any fixed meaning beyond being materially wider or narrower than standard.
In British practice, the space between the rails of a track is colloquially referred to as the "four-foot", and the space between two tracks the "six-foot", descriptions relating to the respective dimensions.
Standard gauge
editIn modern usage the term "standard gauge" refers to 1,435 mm (4 ft 8+1⁄2 in). Standard gauge is dominant in a majority of countries, including those in North America, most of western Europe, North Africa, the Middle East, and China.
Broad gauge
editIn modern usage, the term "broad gauge" generally refers to track spaced significantly wider than 1,435 mm (4 ft 8+1⁄2 in).
Broad gauge is the dominant gauge in countries in Indian subcontinent, the former Soviet Union (CIS states, Baltic states, Georgia and Ukraine), Mongolia, Finland (which still uses the original Soviet Gauge of 1524mm), Spain, Portugal, Argentina, Chile and Ireland. It is also used for the suburban railway systems in South Australia, and Victoria, Australia.
Medium gauge
editThe term "medium gauge" had different meanings throughout history, depending on the local dominant gauge in use.
In 1840s, the 1,600 mm (5 ft 3 in) Irish gauge was considered a medium gauge compared to Brunel's 7 ft 1⁄4 in (2,140 mm) broad gauge and the 1,435 mm (4 ft 8+1⁄2 in) narrow gauge, which became the modern standard gauge.[15]
Narrow gauge
editIn modern usage, the term "narrow gauge" generally refers to track spaced significantly narrower than 1,435 mm (4 ft 8+1⁄2 in).
Narrow gauge is the dominant or second dominant gauge in countries of Southern, Central Africa, East Africa, Southeast Asia, Japan, Taiwan, Philippines, Central America and South America,
During the period known as "the Battle of the gauges", Stephenson's standard gauge was commonly known as "narrow gauge", while Brunel's railway's 7 ft 1⁄4 in (2,140 mm) gauge was termed "broad gauge". Many narrow gauge railways were built in mountainous regions such as Wales, the Rocky Mountains of North America, Central Europe and South America. Industrial railways and mine railways across the world are often narrow gauge. Sugar cane and banana plantations are mostly served by narrow gauges.
Minimum gauge
editVery narrow gauges of under 2 feet (610 mm) were used for some industrial railways in space-restricted environments such as mines or farms. The French company Decauville developed 500 mm (19+3⁄4 in) and 400 mm (15+3⁄4 in) tracks, mainly for mines; Heywood developed 15 in (381 mm) gauge for estate railways. The most common minimum gauges were 15 in (381 mm),[16] 400 mm (15+3⁄4 in), 16 in (406 mm), 18 in (457 mm), 500 mm (19+3⁄4 in) or 20 in (508 mm).
Break of gauge
editThrough operation between railway networks with different gauges was originally impossible; goods had to be transshipped and passengers had to change trains. This was obviously a major obstacle to convenient transport, and in Great Britain, led to political intervention.
On narrow gauge lines, rollbocks or transporter wagons are used: standard gauge wagons are carried on narrow gauge lines on these special vehicles, generally with rails of the wider gauge to enable those vehicles to roll on and off at transfer points.
On the Transmongolian Railway, Russia and Mongolia use 1,520 mm (4 ft 11+27⁄32 in) while China uses the standard gauge of 1,435 mm. At the border, each carriage is lifted and its bogies are changed. The operation can take several hours for a whole train of many carriages.
Other examples include crossings into or out of the former Soviet Union: Ukraine/Slovakia border on the Bratislava–Lviv train, and the Romania/Moldova border on the Chișinău–Bucharest train.[17]
A system developed by Talgo and Construcciones y Auxiliar de Ferrocarriles (CAF) of Spain uses variable gauge wheelsets; at the border between France and Spain, through passenger trains are drawn slowly through an apparatus that alters the gauge of the wheels, which slide laterally on the axles.[18]
A similar system is used between China and Central Asia, and between Poland and Ukraine, using the SUW 2000 and INTERGAUGE variable axle systems.[19] China and Poland use standard gauge, while Central Asia and Ukraine use 1,520 mm (4 ft 11+27⁄32 in).
Dual gauge
editWhen individual railway companies have chosen different gauges and have needed to share a route where space on the ground is limited, mixed gauge (or dual gauge) track, in which three (sometimes four) rails are supported in the same track structure, can be necessary. The most frequent need for such track was at the approaches to city terminals or at break-of-gauge stations.
Tracks of multiple gauges involve considerable costs in construction (including signalling work) and complexities in track maintenance, and may require some speed restrictions. They are therefore built only when absolutely necessary. If the difference between the two gauges is large enough – for example between 1,435 mm (4 ft 8+1⁄2 in) standard gauge and 3 ft 6 in (1,067 mm) – three-rail dual-gauge is possible, but if not – for example between 3 ft 6 in (1,067 mm) and 1,000 mm (3 ft 3+3⁄8 in) metre gauge – four rails must be used. Dual-gauge rail lines occur (or have occurred) in Argentina, Australia, Brazil, Japan, North Korea, Spain, Switzerland, Tunisia and Vietnam.
On the GWR, there was an extended period between political intervention in 1846 that prevented major expansion of its 7 ft 1⁄4 in (2,140 mm) broad gauge[note 1] and the final gauge conversion to standard gauge in 1892. During this period, many locations practicality required mixed gauge operation, and in station areas the track configuration was extremely complex. This was compounded by the common rail having to be at the platform side in stations; therefore, in many cases, standard-gauge trains needed to be switched from one side of the track to the other at the approach. A special fixed point arrangement was devised for the purpose, where the track layout was simple enough.[note 2]
In some cases, mixed gauge trains were operated with wagons of both gauges. For example, MacDermot[20] wrote:
In November 1871 a novelty in the shape of a mixed-gauge goods train was introduced between Truro and Penzance. It was worked by a narrow-gauge engine, and behind the narrow-gauge trucks came a broad-gauge match-truck with wide buffers and sliding shackles, followed by the broad-gauge trucks. Such trains continued to run in West Cornwall until the abolition of the Broad Gauge; they had to stop or come down to walking pace at all stations where fixed points existed and the narrow portion side-stepped to right or left.
Triple gauge
editIn rare situations, three different gauges may converge on to a rail yard and triple-gauge track is needed to meet the operational needs of the break-of-gauge station – most commonly where there is insufficient space to do otherwise. Construction and operation of triple-gauge track and its signalling, however, involves immense cost and disruption, and is undertaken when no other alternative is available.[21]
Nominal track gauge
editThe nominal track gauge is the distance between the inner faces of the rails. In current practice, it is specified at a certain distance below the rail head as the inner faces of the rail head (the gauge faces) are not necessarily vertical. Some amount of tolerance is necessarily allowed from the nominal gauge to allow for wear, etc.; this tolerance is typically greater for track limited to slower speeds, and tighter for track where higher speeds are expected (as an example, in the US the gauge is allowed to vary between 4 ft 8 in (1,420 mm) to 4 ft 10 in (1,470 mm) for track limited to 10 mph (16 km/h), while 70 mph (110 km/h) track is allowed only 4 ft 8 in (1,420 mm) to 4 ft 9+1⁄2 in (1,460 mm). Given the allowed tolerance, it is a common practice to widen the gauge slightly in curves, particularly those of shorter radius (which are inherently slower speed curves).
Rolling stock on the network must have running gear (wheelsets) that are compatible with the gauge, and therefore the gauge is a key parameter in determining interoperability, but there are many others – see below. In some cases in the earliest days of railways, the railway company saw itself as an infrastructure provider only, and independent hauliers provided wagons suited to the gauge. Colloquially the wagons might be referred to as "four-foot gauge wagons", say, if the track had a gauge of four feet. This nominal value does not equate to the flange spacing, as some freedom is allowed for.
An infrastructure manager might specify new or replacement track components at a slight variation from the nominal gauge for pragmatic reasons.
Units
editThe gauge is defined in imperial units, metric units or SI units.
Imperial units were established in the United Kingdom by the Weights and Measures Act 1824. The United States customary units for length did not agree with the imperial system until 1959, when one international yard was defined as 0.9144 meters and, as derived units, 1 foot (=1⁄3 yd) as 0.3048 meter and 1 inch (=1⁄36 yd) as 25.4 mm.
The list shows the imperial and other units that have been used for track gauge definitions:
Unit | SI equivalent | Track gauge example |
---|---|---|
Imperial foot | 304.8 mm | |
Castilian foot[citation needed] | 278.6 mm |
|
Portuguese foot | 332.8 mm | 5 Portuguese feet = 1,664 mm (5 ft 5+1⁄2 in) |
Swedish foot | 296.904 mm |
|
Prussian foot (Rheinfuß) | 313.85 mm | 2+1⁄2 Prussian feet = 785 mm (2 ft 6+29⁄32 in) |
Austrian fathom[citation needed] | 1520 mm | 1⁄2 Austrian fathom = 760 mm (2 ft 5+15⁄16 in) |
Temporary way – permanent way
editA temporary way is the temporary track often used for construction, to be replaced by the permanent way (the structure consisting of the rails, fasteners, sleepers/ties and ballast (or slab track), plus the underlying subgrade) when construction nears completion. In many cases narrow-gauge track is used for a temporary way because of the convenience in laying it and changing its location over unimproved ground.
In restricted spaces such as tunnels, the temporary way might be double track even though the tunnel will ultimately be single track. The Airport Rail Link in Sydney had construction trains of 900 mm (2 ft 11+7⁄16 in) gauge, which were replaced by permanent tracks of 1,435 mm (4 ft 8+1⁄2 in) gauge.
During World War I, trench warfare led to a relatively static disposition of infantry, requiring considerable logistics to bring them support staff and supplies (food, ammunition, earthworks materials, etc.). Dense light railway networks using temporary narrow gauge track sections were established by both sides for this purpose.[22]
In 1939 it was proposed to construct the western section of the Yunnan–Burma Railway using a gauge of 15+1⁄4 in (387 mm), since such tiny or "toy" gauge facilitates the tightest of curves in difficult terrain.[23]
Maintenance standards
editInfrastructure owners specify permitted variances from the nominal gauge, and the required interventions when non-compliant gauge is detected. For example, the Federal Railroad Administration in the US specifies that the actual gauge of a 1,435 mm track that is rated for a maximum of 60 mph (96.6 km/h) must be between 4 ft 8 in (1,422 mm) and 4 ft 9.5 in (1,460 mm).[24]
Advantages and disadvantages of different track gauges
editThis section needs additional citations for verification. (May 2020) |
Speed, capacity, and economy are generally objectives of rail transport, but there is often an inverse relationship between these priorities. There is a common misconception that a narrower gauge permits a tighter turning radius, but for practical purposes, there is no meaningful relationship between gauge and curvature.[25][26]
Construction cost
editNarrower gauge railways usually cost less to build because they are usually lighter in construction, using smaller cars and locomotives (smaller loading gauge), as well as smaller bridges, smaller tunnels (smaller structure gauge).[27] Narrow gauge is thus often used in mountainous terrain, where the savings in civil engineering work can be substantial. It is also used in sparsely populated areas, with low potential demand, and for temporary railways that will be removed after short-term use, such as for construction, the logging industry, the mining industry, or large-scale construction projects, especially in confined spaces (see Temporary way – permanent way).
For temporary railways which will be removed after short-term use, such as those used in logging, mining or large-scale construction projects, especially in confined spaces, such as when constructing the Channel Tunnel, a narrow-gauge railway is substantially cheaper and easier to install and remove. Such railways have almost vanished due to the capabilities of modern trucks. In many countries, narrow-gauge railways were built as branch lines to feed traffic to standard-gauge lines due to lower construction costs. The choice was often not between a narrow- and standard-gauge railway, but between a narrow-gauge railway and none at all.
Broader gauge railways are generally more expensive to build, because they are usually heavier in construction, use larger cars and locomotives (larger loading gauge), as well as larger bridges, larger tunnels (larger structure gauge). But broader gauges offer higher speed and capacity. For routes with high traffic, greater capacity may more than offset the higher initial cost of construction.
Interchangeability
editThe value or utility a user derives from a good or service depends on the number of users of compatible products – the "network effect" in economics. Network effects are typically positive, resulting in a given user deriving more value from a product as other users join the same network.[28] At national levels, the network effect has resulted in commerce extending beyond regional and national boundaries. Increasingly, many governments and companies have made their railways' engineering and operational standards compatible in order to achieve interchangeability – hence faster, longer-distance train operation. A major barrier to achieving interchangeability, however, is path dependence[29] – in this context the persistence of an already adopted standard to which equipment, infrastructure and training has become aligned.
Since adopting a new standard is difficult and expensive, continuing with an existing standard can remain attractive, unless longer-term benefits are given appropriate weight. An example of the consequences of path dependence is the persistence in the United Kingdom – the earliest nation to develop and adopt railway technologies – of structure gauges that are too small to allow the larger rolling stock of continental Europe to operate in the UK. The reduced cost, greater efficiency, and greater economic opportunity offered by the use of a common standard has resulted in the historical multitude of track gauges dwindling to a small number that predominate worldwide.
When interchangeability has not been achieved, freight and passengers must be transferred through time-consuming procedures requiring manual labour and substantial capital expenditure.[30] Some bulk commodities, such as coal, ore, and gravel, can be mechanically transshipped, but even this is time-consuming, and the equipment required for the transfer is often complex to maintain. If rail lines of different gauges coexist in a network and a break of gauge exists, it is difficult in times of peak demand to move rolling stock to where it is needed.
Sufficient rolling stock must be available to meet a narrow-gauge railway's peak demand, which might be greater in comparison to a broader-gauge network, and the surplus equipment generates no cash flow during periods of low demand. In regions where narrow-gauge lines form a small part of the rail network (as was the case on Russia's Sakhalin Railway), extra cost is involved in designing, manufacturing or importing narrow-gauge equipment.
Solutions to interchangeability problems include bogie exchanges, a rollbock system, dual gauge, variable gauge, or gauge conversion.
Dominant railway gauges
editMore than half of the world's railways are built to 1,435 mm (4 ft 8+1⁄2 in) standard gauge.[when?][citation needed] New railways have been built in Africa to standard gauge. Most of the narrow-gauge railways in India are being converted to the dominant, broad-gauge.[31]
System | Installation | ||||
---|---|---|---|---|---|
Gauge | Name | in km | in miles | % world | by location |
1,000 mm (3 ft 3+3⁄8 in) | Metre-gauge railway | 95,000 | 59,000 | 7.2% | Argentina (11,000 km or 6,800 mi), Brazil (23,489 km or 14,595 mi), Bolivia, northern Chile, Greece (in the disused Peloponnese network), Spain (Feve, FGC, Euskotren, FGV, SFM), Switzerland (RhB, MOB, BOB, MGB), Malaysia, Thailand, Cambodia, Bangladesh, East Africa, Vietnam and Denmark |
1,067 mm (3 ft 6 in) | 3 ft 6 in gauge railways | 112,000 | 70,000 | 8.5% | Southern and Central Africa; Nigeria (most); Indonesia (Java and Sumatera) ; Japan; Taiwan; Philippines; New Zealand; and the Australian states of Queensland, Western Australia, Tasmania and South Australia. |
1,435 mm (4 ft 8+1⁄2 in) | Standard-gauge railway | 720,000 | 450,000 | 54.9% | Albania, Argentina, Australia, Austria, Belgium, Bosnia and Herzegovina, Brazil (194 km or 121 mi), Bulgaria, Canada, China, Croatia, Cuba, Czech Republic, Denmark, Djibouti, DR Congo (Kamina-Lubumbashi section, planned), Ethiopia, France, Germany, Great Britain (United Kingdom), Greece, Hong Kong, Hungary, India (only used in rapid transit and High-speed rail), Indonesia (Aceh, LRT Jabodetabek, LRT Jakarta, MRT Jakarta East - West Line Corridor, High-speed rail in Indonesia, and Sulawesi), Italy, Israel, Kenya (Mombasa–Nairobi Standard Gauge Railway), Laos, Liechtenstein, Lithuania (Rail Baltica), Luxembourg, Macedonia, Mauritius (Metro Express), Mexico, Montenegro, Netherlands, North Korea, Norway, Panama, Peru, Philippines, Poland, Romania, Serbia, Singapore MRT, Slovakia, Slovenia, South Korea, Spain (AVE, Alvia and FGC), Sweden, Switzerland, Turkey, United States, Uruguay, Venezuela, north Vietnam. Also private companies' lines and JR high-speed lines in Japan. High-speed lines in Taiwan. Gautrain commuter system in South Africa. New lines in Tanzania and Nigeria. |
1,520 mm (4 ft 11+27⁄32 in) | 5 ft and 1520 mm gauge railways | 220,000 | 140,000 | 16.8% | Armenia, Azerbaijan, Belarus, Georgia, Kazakhstan, Kyrgyzstan, Latvia, Lithuania, Moldova, Mongolia, Russia, Tajikistan, Turkmenistan, Ukraine, Uzbekistan. (all contiguous – redefined from 1,524 mm (5 ft)) |
1,524 mm (5 ft) | 7,065 | 4,390 | 0.5% | Estonia,[32] Finland (contiguous, and generally compatible, except high speed trains, with 1,520 mm (4 ft 11+27⁄32 in) | |
1,600 mm (5 ft 3 in) | 5 ft 3 in gauge railways | 9,800 | 6,100 | 0.7% | Ireland, Northern Ireland (United Kingdom) (1,800 km or 1,100 mi), and in the Australian states of Victoria and South Australia (4,017 km or 2,496 mi), Brazil (4,057 km or 2,521 mi)[when?] |
1,668 mm (5 ft 5+21⁄32 in) | Iberian-gauge railways | 15,394 | 9,565 | 1.2% | Portugal, Spain. Sometimes referred to as Iberian gauge. In Spain the Administrador de Infraestructuras Ferroviarias (ADIF) managed 11,683 km (7,259 mi) of this gauge and 22 km (14 mi) of mixed gauge at end of 2010.[33] The Portuguese Rede Ferroviária Nacional (REFER) managed 2,650 km (1,650 mi) of this gauge of this track at the same date.[33] |
1,676 mm (5 ft 6 in) | 5 ft 6 in gauge railways | 134,008 | 83,269 | 10.2% | India, Pakistan, Bangladesh, Sri Lanka, Argentina, Chile, BART in the United States San Francisco Bay Area |
Prevalence
editTotal for each group of gauges in 2020:[citation needed]
Gauge | Installation (km) | Installation (mi) | Percentage (2020) | Percentage (2014) |
---|---|---|---|---|
Narrow gauge(s) | 233,391 | 145,022 | 17.5% | 15.8% |
Standard gauge | 807,616 | 501,829 | 60.6% | 54.9% |
Broad gauge(s) | 290,705 | 180,636 | 21.8% | 29.3% |
Totals | 1,331,712 | 827,487 | 100% | 100% |
Future
editFurther convergence of rail gauge use seems likely, as countries seek to build inter-operable networks, and international organisations seek to build macro-regional and continental networks. Almost all new high-speed rail lines are built to standard gauge, except in Uzbekistan and Russia.
Europe
editThe European Union has set out to develop inter-operable freight and passenger rail networks across its area, and is seeking to standardise gauge, signalling and electrical power systems. EU funds have been dedicated to assist Lithuania, Latvia, and Estonia in the building of some key railway lines (Rail Baltica) of standard gauge, and to assist Spain and Portugal in the construction of high-speed lines to connect Iberian cities to one another and to the French high-speed lines. The EU has developed plans for improved freight rail links between Spain, Portugal, and the rest of Europe.
Trans-Asian Railway
editThe United Nations Economic and Social Commission for Asia and the Pacific (UNESCAP) is planning a Trans-Asian Railway that will link Europe and the Pacific, with a Northern Corridor from Europe to the Korean Peninsula, a Southern Corridor from Europe to Southeast Asia, and a North–South corridor from Northern Europe to the Persian Gulf. All these would encounter breaks of gauge as they cross Asia. Current plans have mechanized facilities at the breaks of gauge to move containers from train to train rather than widespread gauge conversion. The Northern Corridor through Russia already operates since before year 2000, with increasing volumes China–Europe.
The Americas
editThis section needs to be updated.(May 2023) |
- 2008: Proposed link between Venezuela and Colombia[34][needs update]
- 2008: Venezuela via Brazil to Argentina – standard gauge[35][needs update]
- 2008: A proposed metre gauge line across Southern Paraguay to link Argentina at Resistencia to Brazil at Cascavel; both those lines are 1,000 mm (3 ft 3+3⁄8 in) metre gauge, and the new line would allow "bioceanic" running from the Atlantic port of Paranaguá in Brazil to that of Antofagasta in Chile on the Pacific.[needs update]
Africa
editThe East African Railway Master Plan is a proposal for rebuilding and expanding railway lines connecting Ethiopia, Djibouti, Kenya, Uganda, Rwanda, Burundi, Tanzania, South Sudan and beyond.[36] The plan is managed by infrastructure ministers from participating East African Community countries in association with transport consultation firm CPCS Transcom.[37] Older railways are of 1,000 mm (3 ft 3+3⁄8 in) metre gauge or 3 ft 6 in (1,067 mm) gauge. Newly rebuilt lines will use standard gauge. Regular freight and passenger services began on the standard gauge Mombasa–Nairobi railway in 2017 and on the standard gauge Addis Ababa–Djibouti railway in 2018.
Lines for iron ore to Kribi in Cameroon are likely to be 1,435 mm (4 ft 8+1⁄2 in) standard gauge with a likely connection to the same port from the 1,000 mm (3 ft 3+3⁄8 in) metre gauge Cameroon system.[needs update]
Nigeria's railways are mostly 3 ft 6 in (1,067 mm) Cape gauge. The Lagos–Kano Standard Gauge Railway is a gauge conversion project by the Nigerian Government to create a north–south standard gauge rail link. The first converted segment, between Abuja and Kaduna, was completed in July 2016.
The African Union has a 50-year plan to connect the capital cities and major centres by high-speed railways.
Timeline
editGauge | Date | Chosen by |
---|---|---|
4 ft 8+1⁄2 in (1,435 mm) | 1825 | George Stephenson |
5 ft (1,524 mm) | 1827 | Horatio Allen for the South Carolina Canal and Rail Road Company |
1 ft 11+1⁄2 in (597 mm) | 1836 | Henry Archer for the Festiniog Railway to easily navigate mountainous terrain (Britain's first steam-hauled narrow gauge passenger service in 1865) (originally horse-drawn) |
7 ft 1⁄4 in (2,140 mm) | 1838 | I. K. Brunel |
5 ft (1,524 mm) | 1842 | George Washington Whistler for the Moscow – Saint Petersburg Railway based on Southern US practice |
5 ft 3 in (1,600 mm) | 1846 | Chosen in Ireland as a compromise |
5 ft 6 in (1,676 mm) | 1853 | Lord Dalhousie for British India, following recommendations of Mr. W. Simms, a consulting engineer[38][39] |
3 ft 6 in (1,067 mm) | 1862 | Carl Pihl for the Røros Line in Norway to reduce costs |
3 ft 6 in (1,067 mm) | 1865 | Abraham Fitzgibbon for the Queensland Railways to reduce costs |
3 ft (914 mm) | 1870 | William Jackson Palmer for the Denver & Rio Grande Railway to reduce costs (inspired by the Festiniog Railway) |
2 ft (610 mm) | 1877 | George E. Mansfield for the Billerica and Bedford Railroad to reduce costs (inspired by the Festiniog Railway) |
2 ft 6 in (762 mm) | 1887 | Everard Calthrop to reduce costs; had designs for a matching fleet of rolling stock |
See also
editNotes
edit- ^ The Act of Parliament did not prohibit expansion of the existing broad gauge system, but it had the indirect and delayed effect of forcing conformity with the "standard" gauge eventually.
- ^ Jenkins, S. C. and Langley, R. C. (2002), The West Cornwall Railway, Usk: The Oakwood Press, ISBN 0853615896, gives an illustration and description on page 66.
References
edit- ^ Tratman, E.E. Russell (1908). Railway track and track work (3rd ed.). New York: The Engineering News Publishing Co. p. 383.
- ^ Wilson, John (2021). The train to Oodna-Woop-Woop: a social history of the Afghan Express. Banksia Park, South Australia: Sarlines Railway Books. p. 31. ISBN 9780646842844.
- ^ "Section 12.2". Track Maintenance Guide. Adelaide: Australian National [Railways Commission]. 1988.
- ^ M. J. T. Lewis (1970), Early Wooden Railways, Routledge Keegan Paul, London
- ^ R. Cragg (1997), Civil Engineering Heritage – Wales and West Central, Thomas Telford Publishing, London, 2nd edition, England, ISBN 0 7277 2576 9
- ^ Andy Guy and Jim Rees, Early Railways 1569–1830, Shire Publications in association with the National Railway Museum, Oxford, 2011, ISBN 978 0 74780 811 4
- ^ Don Martin, The Monkland and Kirkintilloch and Associated Railways, Strathkelvin Public Libraries, Kirkintilloch, 1995, ISBN 0 904966 41 0
- ^ N. Ferguson (1995), The Dundee and Newtyle Railway including the Alyth and Blairgowrie Branches, The Oakwood Press, ISBN 0-85361-476-8.
- ^ D. B. Barton (1966), The Redruth and Chasewater Railway, 1824–1915, D. Bradford Barton Ltd, Truro, 2nd edition
- ^ a b Francis Whishaw, The Railways of Great Britain and Ireland Practically Described and Illustrated, 1842, reprint 1969, David & Charles (Publishers) Limited, Newton Abbot, ISBN 0-7153-4786-1
- ^ a b W W Tomlinson, The North Eastern Railway, its Rise and Development, Andrew Reid & Co, Newcastle upon Tyne, 1915
- ^ Nicholas Wood, A Practical Treatise on Rail-Roads, Longman, Orme, Brown, Green and Longmans, London, Third edition, 1838
- ^ "An Act for regulating the Gauge of Railways" (PDF). 18 October 1846. Retrieved 26 April 2010.
- ^ The Russian Railways and Imperial Intersections in the Russian Empire, Karl E. M. Starns, Thesis, University of Washington 2012, p. 33
- ^ "The beginning of the Great Southern and Western Railway".
- ^ Heywood, A.P. (1974) [1881, Derby: Bemrose]. Minimum Gauge Railways. Turntable Enterprises. ISBN 0-902844-26-1.
- ^ "Beyond Thunderdome: Iron Curtain 2k6". Archived from the original on 8 July 2011. Retrieved 10 October 2007.
- ^ Alberto García Álvarez, "Automatic Gauge Changeover for Trains in Spain" (PDF), Fundación de los Ferrocarrilos Españoles, 2010.
- ^ "Experience and results of operation the SUW 2000 system in traffic corridors" (PDF). Archived from the original (PDF) on 19 March 2009. Retrieved 7 December 2008.
- ^ E. T. MacDermot (1931), History of the Great Western Railway, vol. II: 1863–1921, London: Great Western Railway, p. 316
- ^ Fitch, Ronald J. (1989). Making tracks: 46 years in Australian railways. Kenthurst NSW: Kangaroo Press. p. 141. ISBN 0864172702.
- ^ Christian Wolmar, Engines of War: How Wars Were Won & Lost on the Railways, Atlantic Books, London, 2010, ISBN 978-1848871724
- ^ "TOY RAILWAY". The Northern Standard. Darwin, NT: National Library of Australia. 8 December 1939. p. 15. Retrieved 5 December 2011.
- ^ "Track Safety Standards Compliance Manual Chapter 5 Track Safety Standards Classes 1 through 5" (PDF). Federal Railroad Administration. Archived from the original (PDF) on 28 May 2008. Retrieved 26 February 2010.
- ^ Wellington, Arthur (1910). The Economic Theory of the Location of Railways. New York: John Wiley & Sons. pp. 751–754.
- ^ Siddall, William (January 1969). "Railroad Gauges and Spatial Interaction". Geographical Review. 59 (1). American Geographical Society: 36. Bibcode:1969GeoRv..59...29S. doi:10.2307/213081. JSTOR 213081.
- ^ Spooner, Charles Easton (1879). Narrow Gauge Railways. p. 71.
- ^ Shapiro, Carl. (1999). Information rules : a strategic guide to the network economy. Varian, Hal R. Boston, Mass.: Harvard Business School Press. ISBN 0-87584-863-X. OCLC 39210116.
- ^ Liebowitz, S.; Margolis, Stephen (2000). Encyclopedia of Law and Economics. E. Elgar. p. 981. ISBN 978-1-85898-984-6.
- ^ Irish Railways including Light Railways (Vice-Regal Commission. Vol. XLVII. London): House of Commons. 1908. p. 200.
- ^ "Indian Railways: Battle of the Gauges". 22 April 2021.
- ^ Estonian railways today Archived March 3, 2016, at the Wayback Machine, p. 32
- ^ a b Karl Arne Richter (editor), Europäische Bahnen '11, Eurailpress, Hamburg, 2010, ISBN 978-3-7771-0413-3
- ^ "Colombia and Venezuela to build railroad". Archived from the original on 25 March 2012. Retrieved 27 May 2011.
- ^ "Venezuela, Argentina begin construction of railway linking their capitals". China Daily. Xinhua. 21 August 2008. Archived from the original on 4 March 2009. Retrieved 21 August 2008.
- ^ Sambu, Zeddy (29 April 2008). "East Africa: Countries Move to Upgrade Railway Network". Business Daily (South Africa). Archived from the original on 14 May 2014. Retrieved 13 May 2014.
- ^ Muramira, Gashegu (20 April 2009). "East Africa: EAC Railway Master Plan to Be Redesigned". New Times (Rwanda). Retrieved 13 May 2014.
- ^ Chandra, Satish; Agarwal, M.M. (2013). Railway Engineering, Second Edition. India: Oxford University Press. p. 32. ISBN 9780198083535.
- ^ Debroy, Bibek (20 April 2018). "Broad and Standard". business-standard.com. Business Standard. Retrieved 9 January 2024.
External links
edit- track gauge (P1064) (see uses)
- OpenRailwayMap. A global track gauge map
- A history of track gauge Archived 4 December 2008 at the Wayback Machine by George W. Hilton
- "Railroad Gauge Width". Archived from the original on 17 July 2012. – A list of railway gauges used or being used worldwide, including gauges that are obsolete.
- European Railway Agency: 1520 mm systems[permanent dead link ] (issues with the participation of 1520/1524 mm gauge countries in the EU rail network)
- The Days they Changed the Gauge in the U.S. South
- Juan Manuel Grijalvo – The Myth of the "Standard" Gauge