Jump to content

Hebbala metro station

Coordinates: 13°02′39″N 77°35′34″E / 13.044287°N 77.592666°E / 13.044287; 77.592666
From Wikipedia, the free encyclopedia

Hebbala
Namma Metro station
General information
LocationVayunandana Layout, Hebbal Kempapura, Bengaluru, Karnataka 560024
Coordinates13°02′39″N 77°35′34″E / 13.044287°N 77.592666°E / 13.044287; 77.592666
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
Line(s)Blue Line
Orange Line - Approved
Red Line - Planned
Platforms(TBC)
Tracks(TBC)
ConnectionsBus interchange Hebbala BMTC Terminus
Mainline rail interchangeHebbala suburban railway station
Construction
Structure typeElevated, Double track
Platform levels(TBC)
Parking(TBC)
Bicycle facilities(TBC)
Accessible(TBC)
ArchitectNagarjuna Constructions Company Ltd. (NCC Ltd).
Other information
StatusUnder Construction
Station code(TBC)
History
OpeningJune 2026; 17 months' time (June 2026) (TBC)
Electrified750 V DC third rail
Services
Preceding station Namma Metro Following station
Kempapura Blue Line
(Operational around June 2026)
Kodigehalli
Future Service
Patelappa Layout Orange Line
(Approved)
Kempapura
Terminus
Terminus Red Line
(Planned)
Veterinary College
towards Sarjapura
Location
Map

Hebbala is an upcoming elevated metro station on the north–south corridor of the Blue Line[1] of Namma Metro in Bangalore, India. This is a prime location for its neighbouring areas like Hebbal and Kempapura. This metro station is slated to become operational around June 2026.[2][3][4][5]

History

[edit]

Blue Line

[edit]

On November 17 2020, the Bangalore Metro Rail Corporation Limited (BMRCL) invited bids for the construction of the Hebbala metro station, part of the 11.678 km Reach 2B – Package 2 (Hebbala - Bagalur Cross) of the 37.692 km Blue Line of Namma Metro. On September 14 2021, Nagarjuna Construction Company Ltd. (NCC Ltd.) was chosen as the lowest bidder for this segment, with their proposal closely matching the initial cost estimates. [6] As a result, the contract was awarded to the company, which led to the beginning of the construction works of this metro station as per the agreed terms. [7]

Station layout

[edit]

Blue Line Station Layout - To Be Confirmed

Hebbala track layout (TBC)
P#
P#
Station with two tracks and two side platforms
** Under Construction
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform #
Northbound
Towards → KIAL Terminals
Next Station: Kodigehalli
Platform #
Southbound
Towards ← Krishnarajapura / Central Silk Board
Next Station: Kempapura
Change at the next station for Orange Line
Side platform | Doors will open on the left Disabled access
L2

Orange Line Station Layout - To Be Confirmed

Hebbala track layout (TBC)
P#
P#
Station with two tracks and two side platforms
** Under Construction
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform #
Eastbound
Towards → Kempapura
Change at the next station for Blue Line
Platform #
Westbound
Towards ← JP Nagar 4th Phase
Next Station: Patelappa Layout
Side platform | Doors will open on the left Disabled access
L2

Red Line Station Layout - To Be Confirmed

Hebbala track layout (TBC)
to Train Terminates Here
P#
P#
Station with two tracks and two side platforms
** Proposed
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform #
Northbound
Towards → Train Terminates Here
Platform #
Southbound
Towards ← Sarjapura
Next Station: Ganga Nagar
Side platform | Doors will open on the left Disabled access
L2

Connections

[edit]

Entry/Exit

[edit]

See also

[edit]

References

[edit]
  1. ^ "Bengaluru Metro Blue Line: Explore the City Like Never Before! - TimesProperty". timesproperty.com. Retrieved 14 December 2023.
  2. ^ "L&T bags track contracts worth ₹501 crore for Bangalore Metro Phase 2A & 2B | Metro Rail Today". Metro Rail Today: Gateway to Rail & Metro Industry. Retrieved 14 December 2023.
  3. ^ "Metro line to Bengaluru Airport to be ready by June 2026: D K Shivakumar". The Indian Express. 6 June 2023. Retrieved 14 December 2023.
  4. ^ "Bengaluru Airport Metro Line from KIA to Devanahalli Set for Completion by June 2026". TimesNow. 7 June 2023. Retrieved 14 December 2023.
  5. ^ "Metro's ORR, Airport line to be ready by Sept 2026, will benefit IT industry hugely: BMRCL". The New Indian Express. 16 September 2023. Retrieved 14 December 2023.
  6. ^ "NCC Wins Bangalore Metro Airport Line's Construction Work". The Metro Rail Guy. 14 September 2021. Retrieved 24 October 2024.
  7. ^ Service, Express News (16 September 2021). "Nagarjuna Construction Company wins bid to build Namma Metro's Airport Line". The New Indian Express. Retrieved 24 October 2024.
[edit]